The Pacific Highway and Gwydir Highway will be affected by roadworks this week in South Grafton.
Subscribe now for unlimited access.
or signup to continue reading
There will be changed traffic conditions as work is carried out as part of the new Grafton bridge project near the intersection of the Pacific and Gwydir highways.
Road surface investigations will be carried out between 6pm and 6am on Wednesday, October 2 on the northbound lane of the Pacific Highway and the section of the Gwydir Highway (Charles Street) between Bent Street and the Pacific Highway.
READ ALSO:
Traffic will be reduced to one lane, alternate flow on the Pacific Highway between Viaduct Road and Iolanthe Street and on the Gwydir Highway (Charles Street) between Bent Street and the Pacific Highway.
Traffic control and a reduced speed limit of 40km/h will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.